Library of Birmingham – March Site Snapshot Released

The Site Snapshot March 2012Carillion has released to us March’s  abbreviated Site Snapshot about the development as shown here. (Click image to enlarge).

Incidentally the removal of the Tower Crane 2 reinforced concrete base turned out to be a massive job for traditional pneumatic drills. So, a series of controlled explosions was used to split off sections of concrete; scaring thought as this was sited very close to one side of the new building!

Geoff Caine